Brief introduction
● Sewage discharge of washing machine and shower room (or wash basin) or air-conditioning condensate in the basement lower than the main sewer. (If the pumped liquid contains other hard objects, it may cause faults, which are not covered by burks warranty). |
Pumping liquid
● Allowable liquid temperature: 55 ° C (maximum 90 °C for a short time) |
![]() |
||||||
Overall dimensions(Unit of measurement:mm) |
![]() |
|||||||
![]() |
![]() |
|||||||
![]() |
![]() |
|||||||
Technical data |
![]() |
|||||||
![]() |
![]() |
|||||||
![]() |
||||||||
Diagram |
![]() |
|||||||
![]() |
![]() |
|||||||
● Overload, overheating and
● Control box: IP65 |
![]() |
|||||||
![]() |
||||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Installation introduction | Installation of eccentric disc(Apolegamy) |
![]() |
|||||
![]() |
![]() |
![]() |
|||||
● 1:The external single pump series has only one outlet pipe. The diameter of the outlet pipe is a Φ90mm outer diameter PVC water supply pipe or DN80 galvanized steel pipe. The connection with the on-site outlet pipe is flange connection or soft connection. The reducer can be configured to achieve the connection with the on-site pipe diameter. (Special glue shall be used to connect the water outlet pipe. Attention shall be paid to the PVC water supply glue equipment with its own check valve. During installation, a stop valve shall be installed in the water outlet ● 2:The equipment vent can be connected to a PVC drain pipe with an outer diameter of Φ50mm. If it does not conform to the site pipe diameter, the reducer can be used to reduce the diameter before connecting to the vent. The vent pipe is connected to the equipment with a stainless steel hoop (provided by the equipment). (When connecting the outlet pipe, pay attention to the use of PVC glue for water supply. The installation of the vent pipe is required to be higher than the roof or the outdoor green belt).be installed in the water outlet pipe.). ● 3:The external single pump series is reserved with 4 DN100 water inlets and 3 DN40 water inlets. According to the on-site water inlet needs, corresponding water inlet openings can be selected to connect the pipeline. |
![]() |
||||||
Installation steps Tools to be used: electric hand drill, 90mm hole opener (water inlet hole), 35mm hole opener (water inlet hole, air vent hole), slot screwdriver. |
![]() |
||||||
●Prepare tools | ●Tapper alignment and positioning |
![]() |
|||||
![]() |
![]() |
||||||
●The flexible connection big end is fixed on the box | ●The flexible connection small head is fixed on the water inlet pipe |
![]() |
|||||
![]() |
![]() |
||||||
Connecting accessories |
![]() |
||||||
![]() |
![]() |
||||||
Φ 110 rubber flexible joint (connecting the water inlet on the box and the water inlet on both sides) | Φ 50 Rubber flexible joint (connecting the vent on the box and the water inlet on both sides) |
![]() |
|||||
Note: The installation pictures are for reference only, and the positions of different models of boxes or holes will be different. |
![]() |
||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |